UNIDO - Provision of Services Relating to Impact Study of the Main Project Interventions, Cambodia, May 2025 to ongoing:
Cambodia Programme for Sustainable and Inclusive Growth in the Fisheries Sector: Capture component (CaPFish Capture), [EU Project number ACA/2019/408-424], Project Number 180039-Co-Funded By The European Union and Contract No. 3000141284) May 2025 to ongoing: CAPFISH Capture-Post Harvest Fisheries Development project is part of the “Cambodia Programme for Sustainable and Inclusive Growth in the Fisheries Sector” (ACA/2019/408-424) and is co-funded by the European Union. The overall objective is to contribute to the achievement of the Royal Government of Cambodia's long-term vision of social and economic development, food security and poverty reduction. It is in this framework that the "CAPFISH Capture - Post Harvest Fisheries Development" project is designed with the specific objective to contribute to the development of post-harvest fisheries through upgrading of the regulatory and institutional system, as well as the adoption of better practices and innovation by the private sector. This project will aim at inclusive post-harvest fisheries value chain development focusing on strengthening the institutional capacity of Competent Authority for establishing official control systems and subsequently supporting the development of post-harvest fisheries, through capacity building in terms of skills development, food safety, system implementation, matching investment support, and building business support mechanisms.
The EU and the Fisheries Administration delegate UNIDO to implement the CAPFISH Capture – Post-Harvest Fisheries Development project with respect to the following outputs:
- Output 1: Enhanced technical competence and sustainability of the Competent Authority and official control services supporting the post-harvest fisheries.
- Output 2: Enhanced private sector capacity to comply with international standards and market requirements relevant to the post-harvest fisheries.
- Output 3: Enhanced business competitiveness of post-harvest fisheries through innovation and R&D.
- Output 4: Project management, monitoring, and evaluation.

WB-Sustainable Livelihoods and Self- reliance of Refugees in Rwanda (Contract No. 7210794), November 2023 to February 2025 (ongoing):
The specific objectives of the assignment are: The assignment task involves collecting Survey data for a study on sustainable livelihoods and self-reliance of refugees in Rwanda. The primary goal of this study is to promote the economic inclusion of refugees and host communities. The Ministry in charge of Emergency Management (MINEMA) and United Nations High Commissioner for Refugees (UNHCR) developed a Joint Strategy for the Economic Inclusion of Refugees and Host Communities in Rwanda for the years 2021-2024. The strategy aims to empower refugees and neighboring communities to become self-reliant members of Rwandan society by 2030. It focuses on four primary objectives: livelihoods, socio-economic inclusion, self-reliance promotion, and results-based programming. Preliminary review of the Joint Strategy identified a lack of robust socio-economic data and a comprehensive progress-tracking framework. This deficiency is in line with the Rwandan government's Strategic Plan for Refugee Inclusion for 2019-2024, which underscores the importance of regular monitoring and comprehensive assessment. To address this, a survey firm will be appointed to conduct two rounds of Computer-Assisted Personal Interviews (CAPI) in October 2023 and October 2024. The firm will collect 2,000 household surveys in each round. The sample and contact information will be provided by the World Bank, UNHCR, and the Ministry of Emergency Management, with two main strata: refugees in camps and urban areas like Kigali, Nyamata, and Huye.

WB-GoB (BEZA)-National Economic Zone Development Project under Bangladesh Private Investment & Digital Entrepreneurship (PRIDE) Project, August 2023 to ongoing:
The specific objectives of the assignment are:
- Carry out separate Feasibility Study for proposed EZs at Mirsharai (BSMSN), Araihazar (EZ-2), and Satkhira (EZ);
- Assist BEZA for preparing DPP with technical design, drawing and costing and
- Assist BEZA for preparing topographic survey with shape file of proposed EZs.
Tasks for each feasibility study consist of:
- Task-1: A Comprehensive Analysis, Transport Assessment, Industry/Market Assessment and Demand Forecast;
- Task-2: Master Planning, Infrastructure and Financing Requirements and an Environmental and Social Foot Print;
- Task-3: Institutional Framework; and
- Task-4: Economic and Financial Modelling.

PPP-CPA: Business Case Development for Bay Terminal 2 and 3 under Chittagong Port Authority (CPA) Bangladesh, June 2022 to ongoing:
The scope of the work as follows:
a) To assist the government in delivering, designing and implementing the project on the basis of PPP structure.
b) Complete the project risk assessment
c) To structure the project, develop a commercial model, assist in the bidding process, transaction and award of the project in a manner which ensures
- Participation of the best available private sector participation in the bidding process;
- Wide participation by credible and experienced international investors and port operators for the relevant components;
- Selecting/preparing best mode to assess the shortlist investors;
- Financing of the capital cost by the concessionaire;
- Optimizing the revenue potential of the project (one option can be with a regionally competitive port tariff structure) and
- Prepare the Terms of Concession Agreement and head the negotiation with investors.

GoB-WB: Consultancy Services for Road User Satisfaction Survey and Progress Assessment through Result Monitoring Framework (SP-04), WeCARE Phase-1 under RHD, February 2022 to ongoing:
The objectives of the assignments are:
- M&E Framework Monitoring: Collect baseline, midline, and endline indicators for project progress monitoring as provided in the results framework and monitoring and evaluation (M&E) plan in the Project Appraisal Document (for components administered by RHD); and
- Perform the economic and financial analysis of the Program - Phase I (including collecting the necessary traffic data).

GoB-RPCL: Consultancy Services as Owner's Engineer for Project Management and Construction Supervision of Mymensingh 420 MW Dual Fuel (Gas/HSD) Combined Cycle Power Plant Project at Mymensingh, Bangladesh, PUR-008(FS/MYMENSINGH 420 MW/QCBS)/2019-20, December 2021 to ongoing:
The Rural Power Company Limited (RPCL) intends to set up the construction of a Combined Cycle Power Plan of 420 MW capacity at Mymensingh, Bangladesh. The project consists in the construction of a Combined Cycle Power Plant with a 1-1-1 configuration.
Empresarios Agrupados Internacional ("EA") in a joint venture with IRG Development Services Limited (IRGDSL), as engineering consulting firms with extensive international and local experience is providing a complete range of consulting, project management, engineering and design, procurement, construction management, plant testing, safety assessment, quality assurance, as well as plant operation and maintenance support services to the electric utility industry.
The strategic objectives of the Consultant's assignment are to assist RPCL in order to achieve timely successful implementation of the Mymensingh 420 MW Dual Fuel (Gas/HSD) CCPP Project, namely:
- Quality Assurance: compliance of the various project components against agreed technical specifications and level of quality.
- Timely Completion: compliance with the overall project schedule, including the Contractor’s schedule and the interface with other Suppliers and stakeholders.
- Budgetary Control: compliance with the agreed Project budget but also limitation of the costs of subsequent maintenance.
- Environmental and Social Safeguard: to ensure that all communities affected by the project, project stakeholders and the environment receive compensations or that the impacts are mitigated, in accordance with the relevant Safeguard Policies.
- Economic Objectives: to ensure that the implementation of the project reaches the country's development and economic goal by improving power supply.

GOB-BPDB: Supervision of sub-station construction and renovation works of power distribution system development project, Cumilla Zone, BPDB, Cumilla, (Lot-1) October 2018 to Ongoing:
Objective of the assignments.
- Length of line may be included beyond the town area. Actual length of existing lines is to be surveyed which would be determined by BPDB after award of contract;
- The geographical location of the distribution lines and sub-stations are to determine by Project Office and approved by Design & Inspection-II BPDB after award of contract;
- Detail survey, design and drawing of SCADA System for distribution network (33/11 KV GIS, AIS Sub-Station & 33KV, 11KV lines) including the new Sub-Stations and Line (33/11 KV GIS/AIS Sub-Station & 33 KV, 11 KV lines) under this project and coordination with grid sub station of Cumilla Zone;
- Any other scopes felt essential by the Project Director of successful complement of the project and
- Volume of work may vary depending on Revised DPP.

CONTACT US

IRG Development Services Ltd.
D5 Halcyon Heights
Plot: 2/3, Block: A, Asad Gate
Mirpur Road, Mohammadpur
Dhaka-1207, Bangladesh.

Tel: +880-2-48117985
Fax: +880-2-48117986
Email: info@irgdsl.com
Website: www.irgdsl.com